Air conditioning
- You can control it using the air conditioner's remote controller
- Cooling operation period : Mid-May to September
Heating system
- You may adjust the room temperature using the wall pad in the bed room. Press [난방] button and adjust the temperature with up and down button.
- Heating operation period : October to March (Central control System)
Heating and cooling operation may vary depending on local temperature
Hot water
- Hot water is provided 24 hours